The City of Decatur is soliciting Statements of Qualifications from qualified firms to provide engineering design services for PI 0021583, Scott Blvd Complete Streets Plan.
The project will provide a Complete Streets redesign of Scott Boulevard in Decatur, Georgia. The City has received a federal BUILD grant to begin the Preliminary Engineering phase of the project. The anticipated period of performance is January 2027 through November 2029.
All deliverables must comply with applicable GDOT and federal requirements, including the GDOT Plan Development Process, Design Policy Manual, Environmental Procedures Manual, Electronic Data Guidelines and Plan Presentation Guide.
Procurement information
RFQ number: RFQ-484-072226
Project: PI 0021583 Scott Blvd Complete Streets Plan
Selection process: Two-phase qualifications-based selection
Anticipated award: One multi-phase, project-specific contract
Phase I will evaluate the qualifications of the proposed Project Manager and Key Team Leaders, available resources, workload capacity, relevant experience and past performance. At least three of the most highly qualified firms are expected to advance to Phase II. Finalists will submit a technical approach and participate in an interview.
Important communication restriction
From the date of advertisement until the successful respondent is selected and the award is officially announced, firms may not communicate about this solicitation with City of Decatur staff members or elected officials.
All questions and requests for clarification must be submitted in writing to: Julie Gyuricza Julie.Gyuricza [at] decaturga.com (Julie[dot]Gyuricza[at]decaturga[dot]com)
General updates, clarifications, addenda and official announcements will be posted on this webpage and the Georgia Procurement Registry. Interested firms are responsible for monitoring both locations.
Schedule
|
Event |
Date and time |
|---|---|
|
RFQ advertised |
July 22, 2026 |
|
Pre-proposal meeting |
August 3, 2026 at 2:00 PM |
|
Written questions due |
August 6, 2026 at 2:00 PM |
|
Responses to questions posted |
August 13, 2026 at 2:00 PM |
|
Phase I Statements of Qualifications due |
August 20, 2026 at 2:00 PM |
|
Finalists notified |
August 27, 2026 |
|
Finalist questions due |
September 3, 2026 at 2:00 PM |
|
Phase II technical approach and past performance due |
September 10, 2026 at 2:00 PM |
|
Shortlist interviews |
September 16, 2026; time to be determined |
|
Preferred firm selected |
September 24, 2026 |
All times are prevailing local time in Decatur, Georgia.
The pre-proposal meeting will be held at:
Decatur Public Works Community Room
2635 Talley Street, 1st Floor
Decatur, GA 30031
Required GDOT prequalification
The proposed team must hold all GDOT Area Classes identified in Exhibit I of the RFQ at the time Statements of Qualifications are due.
The Prime Consultant must hold GDOT Area Class 3.02, Two-Lane or Multi-Lane Urban Roadway Design. The prime consultant or its subconsultants must collectively hold the additional environmental, traffic, roadway, Complete Streets, utility, drainage, structural, surveying, subsurface utility engineering, geotechnical and erosion-control Area Classes listed in the RFQ.
Failure to demonstrate current prequalification in every required Area Class will result in disqualification.
Respondents should carefully follow the personnel, page-limit and submission requirements contained in the RFQ.
Submission instructions
One electronic PDF is required for each phase. Statements of Qualifications must follow the organization, content, formatting, naming and page-limit requirements in the RFQ.
Submit the Phase I Statement of Qualifications through the following Dropbox request:
https://www.dropbox.com/request/46t0x56ni8896mxnf1hv
Phase I Statements of Qualifications must be received by August 20, 2026 at 2:00 PM. Late submissions will not be accepted unless the deadline is formally revised through an official addendum.