Pipeline Replacement
Atlanta Gas Light Resources Company (AGL), through their contractor Southeast Connections, LLC, (SEC) will be working in the City of Decatur over the next 4-5 months to replace old metal gas mains as part of a 15-year project known as the Pipeline Replacement Program (PRP). AGL has prepared an explanation handout for the PRP that explains this program:
>Handout (PDF)
Phase III: Beginning March 22, 2010
>Phase III street map (PDF)
| Street |
Details |
| Church St. |
Starting at N. Decatur Rd. going east for 1700 ft |
| N. Decatur Rd. |
Between Church St. and Barton Way |
| Medlock Rd. |
Between Greylock Pl. and Scott Blvd. |
| Church St. |
Between N. Decatur Rd. and Sycamore Dr. |
| Church St. |
Between Sycamore Dr. and Medlock Rd. |
| Church St. |
Between Medlock Rd. and Willow Lane |
| Sycamore Dr. |
Between Church St. and Ponce de Leon Ave. |
| Pine View Dr. |
Between Sycamore and Woodhaven Dr. |
| Poplar Lane Way |
Between Woodhaven Dr. and Bridlewood Cir. |
| Pinehurst St. |
Between Sycamore Dr. and Winn Way |
| Hillcrest Ave. |
From Springdale going north for 500 ft. |
| Hillcrest Ave. |
Between Springdale and Oak Lane |
| Mountain View St. |
between Oak Lane and Ponce De Leon Ave. |
Phase II: Benton-Georgia, Inc. Utility Construction will perform pipeline replacements on the following streets in the city during this phase of the program:
>Phase II street map (PDF)
| Street |
Details |
| Candler Dr. |
Between Candler Rd. and Candler Point Way |
| Park Dr. |
Between Candler Rd. and W. Dearborn Cir. |
| W. Dearborn Cir. |
Between Park Dr. and the dead end |
| Brower St. |
Between S. Candler St. and Garland Ave. |
| McClean St. |
Between St. and E. Pharr Rd. |
| Garland Ave. |
Between S. McDonough St. and E. Pharr Rd. |
| Griffin Cir. |
Between S. McDonough St. and Garland Ave. |
| S. McDonough St. |
Between E. Hill St. and Garland Ave. |
| W. Pharr Rd. |
Between Fayetteville Rd. and Russell St. |
| Fayetteville Rd. |
Between Spring St. and Gordon St. |
| 5th Ave. |
Between Northern St. and Oakview Rd. |
| 4th Ave. |
Between Northern St. and Oakview Rd. |
| Gordon St. |
Between 4th Ave. and 5 Ave. |
| 2nd Ave. |
Between Gordon St. and Oakview St. |
| Oakview Rd. |
Between 1st Ave. and 2nd Ave. |
Phase I: Scheduled for completion January 2009
>Street map (PDF)
| Street |
Details |
| Mead Rd. |
Main installed on the south side of street in the sidewalk or back of curb. |
| Olympic Pl. |
Main installed on the west side of street from college to lot 180 transition to east side of road to 100’south of lot 212 in the sidewalk. |
| Jefferson Pl. |
Main installed in the sidewalk on the west side of street. |
| Greenwood Pl. |
Main installed on the west side of street in the sidewalk. |
| Evans Dr. |
Main installed on the south side of street in the sidewalk. |
| Kings Hwy. |
Main installed on the west side of street in the sidewalk. |
| Ansley St. |
Main installed on the south side of sidewalk back of curb and in the sidewalk. |
| Greenwood Ave. |
Main installed on the west side of street in the sidewalk and back of curb. |
| McKoy St. |
Main installed on the west side of street in the sidewalk and back of curb. |
| Oakview Rd. |
Main installed on the east side of street in the sidewalk and back of curb. |
| W. Benson St. |
Main installed on the south side of street in the sidewalk and back of curb. |
| Adams St. |
Main installed on the east side of street in the sidewalk and back of curb. |
| W. Hancock St. |
Main installed on the south side of street in the sidewalk and back of curb. |
| S. McDonough St. |
Main installed on the west side of street in the sidewalk and back of curb. |
| Adams St. |
Main installed on the east side of street in the sidewalk and back of curb. |
| E. & W. Davis St. |
Main installed on south side of street in the sidewalk and back of curb. |
| Third Ave. |
Main installed on the west side of street in the sidewalk and the back of curb. |
|
Hood Cir.
|
Main installed on the southwest side of street in the sidewalk and the back of curb. |
| Cambridge Ave. |
Main installed on the west side of street in the sidewalk and the back of curb. |
| Feld Ave. |
Main installed on the east side of street from college to lot 194 transitioning to the west side of street in the sidewalk. |
| Atlanta Ave. |
Main installed on the east side of street in the sidewalk and back of curb. |
| Greenwood Cir. |
Main installed on the southside of the street in the sidewalk and back of curb. |
| Robin St. |
Main installed on the south side of street in the sidewalk and the back of curb. |
| Adair St. |
Main installed on the west side of street in the sidewalk. |
| Hibernia Ave. |
Main installed on the north side of street in the sidewalk and back of curb. |
| Drexel Ave. |
Main installed on the west side of street in the sidewalk and back of curb; at Hamshire Avenue the main will cross to the east side of street in the sidewalk and back of curb. |
| Second Ave. |
Main installed on the west side of street in the sidewalk and back of curb. |
| W. Howard Ave. |
Main installed on north side of street in the sidewalk and back of curb. |
| Hampshire Ave. |
Main installed on the north side of street in the sidewalk and back of curb. |
To announce this upcoming project, the planned start date being July 21, 2008, AGL sent in mid June to each effected property owner a Project Notification letter. As further notification of construction commencement AGL will distribute a door hanger to all properties on each listed street approximately 1 week prior to the start of work on that street:
>Notification door hanger (PDF)
After pipeline installation is completed on each street SEC will personally attempt to schedule the required service conversion for each property from the old system to the new one. Should a property owner not be available, a second door hanger will be left that advises the property owner of the conversion work completed and the need to call SEC or AGL to schedule service restoration for the relighting of all appliances that utilize natural gas in the residence.
>Work completed door hanger (PDF)
All non-residential user service conversions will be pre-scheduled with the user by SEC.
Any questions concerning this program should be directed to AGL at the Pipeline Replacement Program Hotline by calling 404-584-3039 or by email at pipelinereplacements@aglresources.com.